Ancillary Work for the Test Bench

Ancillary Work

Our group collaborates with third‑party partners to provide proposals for various auxiliary equipment related to your test‑bench facilities.

main auxiliary systems and equipment we can propose include:
 ✔Cooling systems (cooling towers, water tanks)
 ✔Oil–water separation tanks
 ✔Silencer systems
 ✔Base plates
 ✔Temperature‑control units
 ✔Radiators
 ✔Other related auxiliary equipment

Cooling system

Scope of the project

 ✔Selection of cooling system
 ✔Selection of underground water tanks
 ✔Heat load calculation

Base plate

Scope of the project

 ✔Installation of the dynamometer on the base plate
 ✔Alignment adjustment between the dynamometer and the base plate

Coolant temperature‑control unit

Main specifications

Engine power 2200kW
Cooling Capacity 2200kW
Rated Control Range 50℃〜110℃
Cooling‑Water Flow Rate 162m³/h
Max pressure 6.0bar
Interface EtherCAT
Dimension (WHD) 3500×2500×1000mm

Fuel temperature‑control unit

Main specifications

Engine power 4300kW
Fuel Diesel
Cooling Capacity 35kw
Rated Control Range 60℃
Fuel Flow Rate 30L/min (6bar)
Control Accuracy ±0.3℃
Interface EtherCAT
Supply Temperature Range 20℃~30℃
Dimension (WHD) 1800×2250×450mm

Charge –air intercooler

Main specifications

Heat dissipation 270kW
Air / Flow rate 5600kg/h
Charge‑Air Temperature
Downstream of the Compressor
260℃
Charge‑Air Temperature Upstream of the Engine Intake
(Control Temperature)
50℃(Max 65℃)
Control Accuracy ±2℃
Maximum Cooling‑Water Flow Rate 30㎥/h
Max pressure bar